FEW WORDS ABOUT US
Find out about Matteo Construction
MATTEO CONSTRUCTION
Matteo Construction
We have year of experience
About Us
What Makes us Special
WORK HISTORY
Marney Construction Ltd – 01/2023-Present
Roles and responsibilities
• – Managing works on site and supervising operatives
• – Maintaining good work and housekeeping to a high level standards
• – Informing the workforce about activities and hazard control on a daily basis • – Ensuring health and safety compliance
• – Ensuring quality standards
• – Managing program and delivery logistics
• – Collaborating with sub-contractors and main contractors regularly. Arranging coll-off reinforcement , concrete, etc.
1. Location-Steppingley-Bedford
2. Client Farrans , Value of the project 8 millions
3. Full packages groundworks+RC frame
4. Project name: ILS and care home
● Cranes-2 ,
● Cores-4 + 2 Raisers , 4-8 levels
● Blocks-4 ,
● 60-80 operatives ,
Trac Construction Ltd – 11/2021 – 01/2023
Roles and responsibilities
• – Managed works on site and supervised operatives
• – Maintained good work and housekeeping
• – Informed the workforce about activities and hazard control on a daily basis • – Ensured health and safety compliance
• – Ensured quality standards
• – Managed program and delivery logistics
• – Attended meetings with sub-contractors and main contractors regularly. Arranging coll-off reinforcement , concrete, etc.
1. Location-Ilderton Road
2. Client:HG , Value of the project 10 million
3. Full packages groundworks + RC frames
4. Project name:Flats
● Cranes-2
● Cores-2 + 1 Raisers , 15 Floors
● Blocks-2 , 1 Basement + Podiums
● 60 operatives
1. Location-Ilford High street
2. Client:Boom , Value of the project 5 million
3. Full packages groundworks + RC frames
4. Project name:Flats
● Crane-1
● Core-1 ,12 Floors
● Block-1
● 20-40 operatives
O’Halloran (OHOB) – 12/2019 – 11/2021
Multi projects -All over London(Value client such as Barkeley home ,Bellway)
Roles and responsibilities
• – Ensured health and safety compliance
• – Ensured quality standards
• – Managed program and delivery logistics
• – Dealt with subcontractors and main contractors on a daily basis.
2. Client L & Q , value of the project 13+ million
3. Full packages,Groundworks,Rc frames and townhouses
4. Project name:Riverside project
● Cranes-4
● Cores-8 , 4-12 floors
● Blockers-8
● 60-80 operatives
2. Client:Barratts,value of the project 7 million
3. Full packages
4. Project name:Ashley road Flats
● 2 jump forms
● Cores-1,13 floors
● Cranes-2
● Blockers-2 + podium
Keltbray Group at Battersea Power Station– 01/2019 – 12/2019
Roles and responsibilities
– Informed the workforce about activities and hazard control on a daily basis
– Ensured health and safety compliance
– Ensured quality standards
– Managed program and delivery logistics
– Dealt with sub-contractors and main contractors on a daily basis
2. Client:Sir,mcAlpine value of the project 30+ million
3. Full packages , 4 levels down, large podium , 19 floors levels high , 3 slip forms ,1 jump form ,
2 large transfers beams and walls , 1 large transfer slab , 5 blocks , 5 tower cranes + 2 mobile cranes ,
precast columns, removing old bridges and temporary piles and capping beams etc.
4. Project name : Battersea Power Station
JRL Environmental LTD -Hertfordshire, England (10/2017-01/2019)
Multi projects (WIth our value clients Bovis, Mace group,Barratts , Waits)
Roles and responsibilities
-Informed the workforce about activities and hazard control on a daily basis
-Ensured health and safety compliance
-Ensured quality standards
-Managed program and delivery logistics
-Dealt with subcontractors and main contractors on a daily basis
2. Full packages, groundwork +RC frames with 2 basement , large podium , 4 craines, 6 blocks , slip forms , all
pre-cast verticals and balconies
3. Client:MIDGard, Value of project 15 + million
2. Client: Willmott Dixon ,Value of the project 11 million
3. Full packages, Groundworks and RC frames all pre cast verticals , 4 blocks , 2 cranes , 8 floors levels ,
2. Client:Bailey more , Value of the project 9 million
3. Full packages , Groundwork + Rc frames With 1 crane, 2 slip forms , Precast columns and walls + Slab ages,
1 basement, 19 floors high , 2 blockers ,30 operatives
Client:Mid gard , Value of the project 12+ million
Full packages with 4 slip formes , 1 jump form , 1 basement , large podium , 4 Blocks , 15 floors high , 2 blocks all traditional verticals, 2 blocks precast column and walls , 3 cranes ,90-100 operatives , all formwork with honey bag tables
JBS Ltd 04/2016 – 10/2017
Roles and responsibilities
-Informed the workforce about activities and hazard control on a daily basis
-Ensured health and safety compliance
-Ensured quality standards
-Managed program and delivery logistics
-Dealt with subcontractors and main contractors on a daily basis
Client :Hills Group Value of the project 8 million
Full packages groundwork +RC frames with 2 cranes,3 blockers,4 cores, 1 podium and 1 basement, 10 floors high
60-70 operatives all traditional formwork
O’Halloran (OHOB) 01/2010 – 04/2016
Roles and responsibilities
– Informed the workforce about activities and hazard control on a daily basis
– Ensured health and safety compliance
– Ensured quality standards
– Managed program and delivery logistics
– Dealt with subcontractors and main contractors on a daily basis
Client:ST James(Barkeley homes group) Value of the project 18 + million
Full packages , groundwork +RC frame with 9 blocks from 7 – 19 floors , 1 large podium with retain walls , 1 basement ,5 cranes ,100 + operatives
2. Client:Barkeley home Value of the project 11 million
3. Full packages Groundwork +Rc Frame with 2 jumps forms , 4 blocks , 2 tower cranes , 1 mobile crane , 2
traditional cores , traditional and titan sky deck formwork, all traditional verticals
Multi other project around London with our Valued client of barkeley group and Canary Wharf ; barratts and redrow, etc.
Morney Construction 12/2008 – 01/2010
Roles and responsibilities
– Informed the workforce about activities and hazard control on a daily basis
– Ensured health and safety compliance
– Ensured quality standards
– Managed program and delivery logistics
– Dealt with sub-contractors and main contractors on a daily basis
2. Client Cardy Value of the project 7 million
3. RC frame package with 8 story high buildings , 2 basement ,1 block , 1 car lift , 1 crain , all traditional formed
work and verticals , 1 core and walls and columns
2. Client :Oak Wood Value of project 2 million
3. Package ground beams/slabs lift pits + all the reinforcement , all work and lifts been carry out with machines
and 10 operatives .
KOB Ltd 01/2007 – 11/2008
Roles and responsibilities
– Ensured quality standards
– Dealt with sub-contractors and main contractors on a daily basis – Ground Works
– Shuttering Works
2. Client:O’shea-galliard homes Value of the project 1-2 million
3. Packages all finishing works with Slabs,Paving , Cerbing , Eadgeys , roads and cars
park
2. Value of the project 500000-1 million
3. All groundworks and a swimming pool
FDL Ltd 01/2006 – 01/2007
Roles and responsibilities
– Dealt with a group of 10 operatives and leading form work – Team Leader
– Shuttering Works
2. Client Barratts Value ?
3. Full packages Groundwork + RC Frame with 2 cranes,3 large blocks 7-12 Floors high , 1 basement ,1
podium , 3 cores + 1 raizer ,70 operatives,
Galldris Construction Ltd 08/2003 – 12/2005
Roles and responsibilities
– Ensured quality standards
– Dealt with a group of operatives and leading them to the right guidance – Team Leader
– Ground Works
– Shuttering Works
2. Client:KIER group , value ?
3. Full package, groundwork and formwork
2. Client: ? Value ?
3. Operatives 50-100
Why Us
At Matteo Construction, we are not just another construction company in London. We are creators, architects, and visionaries dedicated to building spaces that are not only functional, but also beautiful and sustainable.
With our years of experience and expertise in the industry, we guarantee top-quality work that exceeds your expectations. From commercial and residential projects to multi-level buildings, trust us to bring your dreams to life. Contact us today and let Matteo Construction be the catalyst for turning your vision into stunning reality.
Commercial Work
Residential Work
Quality Work
Why Choose Us
Matteo Construction
Contact Us
Providing the best Construction solutions for your dreams
Our Team